Remove the incoherent parts and prime the substrate with Cemix 2613
Corner applications
Corner applications
First, apply the waterproofing compound Cemix 8110 into and on the corners. Then apply the compound to the transition between the floor and the wall.
Inserting the elastic tape into the corner
Inserting the elastic tape into the corner
Firmly insert the corner shaped flexible sealing tape Cemix 8103 or 8104 into the applied waterproofing compound. Apply Cemix 8100 into the transition of the wall and the floor.
Sticking the cuff
Sticking the cuff
Apply the cuff Cemix 8105 at the connection of the drains or water inlets according to the size of the hole.
First layer application
First layer application
Apply the first layer of waterproofing compound Cemix 8110 with a trowel, roller, or brush over the entire surface.
Second layer application
Second layer application
When the first layer is dry, apply the second layer of waterproofing compound Cemix 8110 crosswise.
Waterproofing under ceramic coverings for interior spaces
Waterproofing under ceramic coverings for interior spaces